pod303 - frequently asked questions


Download 32 reasons for pod303

Structure:
  • Pods are fabricated using UK class “O” flame retardant materials.
  • Body panels are colour fast and water resistant
  • Worktop materials are food safe.
  • Additional bumper bars can be added for hostile areas
  • Servery counters can be linked to provide complementary offers or greater capacity
Mobility:
  • Servery and service hubs are demountable and can be moved independently.
  • Pods can be “flat-packed” to ease access.
Services:
  • Pods contain water and electrical services [including water heater] within the rear service hub.
  • Site services connections should be terminated below or above the rear hub [pump required for waste]
  • Pods are built to suit an incoming 63amp single phase electrical supply and bottled water as standard.
  • Pods are built to suit 240V single phase electrical as standard [110V and 3-phase is available]
  • Pods303 will adapt your pod to suit the services you require.
Branding:
  • Menu-boards are low cost and easily interchangeable
  • Wall graphics are flame retardant, colour fast and water resistant.
  • Counter-front graphics can be permanent reverse screen acrylic or durable vinyl.

 

 
contact us

If you would like to contact us directly or to arrange a meeting, you can give us a call on +44 (0) 1592 582 782. You will speak to someone who can answer all your questions & give you everything you need to know.

a:
Castle Court, Carnegie Campus Dunfermline, Fife, Scotland, UK KY11 8P
t:
+44 (0) 1592 582 782

email updates